How can I schedule a maintenance task for Equipment?

  • Updated
  1. In the Equipment Details Page, go to the Maintenance Tab.
  2. Click on the + button.
     

Task.jpg

 

In the Add Maintenance window:

  1. Give the Maintenance Task a Title.
  2. If relevant, provide a Description.
  3. Indicate a Start Date.
  4. Specify the number of days for Done Within Days (this is how long the maintenance should take from the given start date).
  5. Indicate if and how often the Maintenance Task is to be repeated.

  6. Select the Executor(s) for the task.
  7. In order for the Maintenance to be scheduled, you will need to Activate it by turning the Active switch to ON.
  8. Save.