- Select the type of Design Control from the Design Control Dropdown
- Click on the Action button to reveal the options available
- Send for Review/ Send for QA/ Approve (depending on how you have configured the roles in the Project will affect the workflow of each design control)
Only when all Design Controls are in Approved status can the Project be moved on to the next status.
Each item per type of Design Control will need to be approved individually and then the overall Design Control can be approved once each of these are in the Approved status.
The approval process begins with individual items within each Design Control phase. Each item must be approved individually before the phase can be moved to the next status. Once all phases are approved, the project can then advance to the next status.
Relevant for: Administrators / Managers / Regular Users