What prefixes are used in the Design & Development tool

  • Updated

The following prefixes are those that you will come across in the Design & Development tool.

It is possible to customise the Projects prefix (the default prefix is PR).

  • PR Projects
  • UN User Needs (one of the Design Controls)
  • DI Design Inputs (one of the Design Controls)
  • DO Design Outputs (one of the Design Controls)
  • VER Design Verification (one of the Design Controls)
  • VAL Design Validation (one of the Design Controls)
  • RUN Design verification and validation runs

Design Control Items (UN, DI, DO, VER, VAL) include their parent project ID in their identifier
(e.g., PR1-UN1, PR1-DI1, PR1-VAL1).

Verification/Validation Runs include the full ID of their parent item
(e.g., PR1-VAL1-RUN1).

 

  Relevant for: Administrators / Managers / Regular Users

Was this article helpful?

0 out of 0 found this helpful

Have more questions? Submit a request