An Effectiveness Check can be added to a Change Request by the QA role, when the CR reaches Under Signing By QA status.
On signing off in this status follow the workflow proceeds as follows:
- Introduce your Password.
- Include a Statement.
- Select Yes from the Effectiveness Check Required dropdown.
- Add a description.
- Provide a due date.
- Sign off electronically.
- In the Effectiveness Check Pending status a Conclusion must be provided.
- Save the Conclusion.
- Set the CR to Effectiveness Pending Approval to be reviewed by QA or set to Closed.
- QA can set the CR to Closed or Reject the Effectiveness Check back to pending approval status.
Relevant for: Administrators / Managers